2019 Electrical Network Upgrade – New Plymouth
Drillco was chosen to deliver the second stage of the Network upgrade in partnership with Powerco.
The project ran over approx. 4 months and was successfully delivered in all aspects.
Drillco provided Traffic, Utility detection, Project management, Excavation, pipe installation, backfill and reinstatement.
This was a challenging and rewarding project to deliver across New Plymouth.
Supply and installation of ducts as per Carrington-Moturoa 33kV Cable - Option 1 (Drawing
RZ033000-EEE-DG-0102 ) from the intersection of Tukapa St and Borrell Av to the intersection of
Devon St West and Seaview Rd, via Borrell Av and Seaview Rd
• Supply and installation of ducts as per Carrington-Moturoa 33kV Cable - Option 3 (Drawing
RZ033000-EEE-DG-0104) from the intersection of Devon St West and Seaview Rd to Moturoa
Substation, via Devon St West, Bayley Rd, and Breakwater Rd